Researchv0.1.0-alpha · revised 2026-08-01
Reserve Architecture
Coverage, redemption, and audit.
Research: Under active modeling or analysis. Conclusions are provisional.
Any future unit of account must be backed by disclosed reserves with published coverage ratios, redemption terms, stress assumptions, and independent audit.
Requirements
- Coverage published on a fixed schedule
- Redemption terms fixed in advance and contractually enforceable
- Stress scenarios published with their assumptions
- Independent auditor with a public engagement letter
Undisclosed reserves are disqualifying. This is the failure mode that has destroyed comparable private systems most often.
Chapter metadata
- Status
- Research
- Version
- 0.1.0-alpha
- Created
- 2026-08-01
- Last revised
- 2026-08-01
- Last reviewed
- Not yet reviewed
- Authors
- ISILP
- Governing proposals
- IIP-0003
- Source
spec/400-intelligent-currency/reserve-architecture.mdx
Cite this page
ISILP. Reserve Architecture. The Intelligentism Specification, version 0.1.0-alpha (revised 2026-08-01). https://intelligentism.isilp.org/spec/intelligent-currency/reserve-architecture